| Solution |
PMT worked closely with SITA and Equant to mange
the pre-configuration, shipment and on site set-up of
new Windows XP PC’s. PMT planned and managed resources
throughout 60 countries worldwide to complete the deployment.
PMT developed standard installation documentation for
the project, which detailed the steps required for data
transfer, network set up, e-mail configuration and remote
access, then developed a site specific scope of work
for each location to be utilized by the in country resources.
Project tracking and reporting challenges were overcome
through the use of a web based systems for verifying
PC configuration completion at each location.
PMT was able to overcome time zone, language and distance
constraints to deliver this worldwide deployment on
time and on budget for SITA and the IMF
. |